I applied through a recruiter. The process took 5 weeks. I interviewed at RedSeal (Pune) in Dec 2025
Interview
The interview process was very poor and took a lot of time, ultimately resulting in a waste of time and a bad outcome.
My interview process lasted about 40 days, during which Red Seal conducted four interview rounds, each lasting one hour.
The final technical round was conducted by the President of Red Seal. In total, four rounds were held—two rounds with interviewers from India and two rounds with interviewers from the US. In all four rounds, I received positive feedback.
However, there was no response from HR for a long time. When I followed up, I was informed that I was not selected in the final round and that the position is still on hold, as they are looking for a better candidate.
Interview questions [3]
Question 1
1.Can you brief on the types of configurations you do on switches and routers, including Layer 2 and routing protocols?
I recently went through the interview process for the position of Senior Technical Support Engineer. I interviewed with the Director, David Ries, Senior Technical Support Engineer, Marat Popov, and Customer Success Engineer, Sayed Din.
I had a great experience with David and Marat. They both were courteous and professional. However, I had a terrible experience with Sayed. He would ask a question, and wouldn't even let me answer it, instead he would answer the question himself and conclude I don't know the material. Also, he asked for my video to be on, while he kept his off the entire time. He was rude and disrespectful. From the start of the conversation, he was dismissive for no reason at all.
Redseal is a prestigious and well respected company. They should not have someone like Sayed representing them by interviewing candidates, because well qualified candidates would be unfairly dismissed through his lack of professionalism and ill-mannered attitude.
I hope human resources takes this seriously and acts upon it.
Interview questions [1]
Question 1
He would ask a question and answer it himself, without giving me a chance to answer
It took 1.5 months to complete all 8 rounds of interviews. Finally, at the time of issuing the offer letter, they had said that we cannot meet your expectations even though the expectation was very clear before starting the interview process.
Interview questions [1]
Question 1
Interview questions related to what is written in the resume, process, and project